Ecosystem modules

SFPlan

Challenges Addressed
  • Preliminary reserves estimation using innovative exploration technology

  • Probabilistic reserves and production profile forecast (P10, P50, P90)

  • License areas ranking by investment attractiveness

  • Technical and economic feasibility

  • Cartographic support of exploration stages, including structural framework modeling based on seismic analysis or exploration drilling results

  • Selection of production method, operating mode, and design of optimal well location

  • Well performance modeling: IPR/VLP, inflow profile calculation, selection of ESPs, gas lift, and natural flow

  • Analysis of geological structure, 2D/3D visualization of reservoirs and formations

  • Creation of 3D geological and hydrodynamic models

  • Economic evaluation of different development scenarios

Effects
  • Narrowing down Investment risks

  • E&P investments optimization

  • Effective data acquisition of initial geological information on the explored area, including identification of tectonic structures and formations

  • Investments risks reduction

  • Oil recovery factor increase

  • Ability to perform multi-scenario analysis and select the optimal strategy

  • More accurate forecasting of production rates and production launch timelines